Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Parts Included
A. Waste Bin(s) (3)
B. Sliding Assembly
C. Mounting Screws (4)
D. Lids (if supplied)
A
B
D
C

Tools Required

• Phillips Screwdriver
• Tape Measure
• Pencil
Optional
• Drill with 1/16" bit for Pilot Holes
Product Assemblies
SCB-15-3-20
SBM-15-3-20
2700 Oak Industrial Drive NE , Grand Rapids, MI 49505 USA
800.253.1561 • 616.459.3311 • www.kv.com
SLIDING TRIPLE WASTE BINS
Inspect all parts and read all instructions prior to beginning assembly and installation.
Place sliding assembly on cabinet floor, right behind the back edge of the cabinet face frame. If
1
installing in a frameless cabinet,
align sliding base assembly parallel to cabinet opening. Close door to make sure the assembly will not
hold cabinet door open. Also, check to see if unit will clear the door opening when fully extended.
Once position is determined, fasten in place using four mounting screws provided and the Phillips
head screwdriver.
Optional step: Mark placement of mounting holes with a pencil, remove sliding base assembly and
drill pilot holes for fastening screws. Place sliding base assembly back into position and fasten with
the provided screws.
2
Insert bins into cages. Place lids on top of bins (if supplied). The orientation of your bins is
demonstrated in the Top View chart below. If your unit does not come pre-packed with lids and you
would like lids, visit www.kv.com to purchase the lids you require. Installation is now complete.
1
Top View
Triple Bin
BIN
BIN
BIN
Overall Cabinet Width:
18"
©2012 Knape & Vogt. All rights reserved.
Knape & Vogt
reserves the right to change specifications without notice. Made in USA.
®
measure 1/2" to 3/4" back from front of cabinet opening, and
A
A
310173-D_0615

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Kvsbm15-2-20

Table des Matières