FOR INFLATION
• On the pump (1): connecting components on
«INFLATE» in the same order as in the picture
• On the valve (2) : Remove the valve cap (A), fit the
appropriate valve to the end of the inflation tube
(B) and connect it to the valve.
You may now begin inflating the beam with smooth
and regular pump strokes.
The pressure reducing valve, avoids any risk of
over-inflation. When the maximum pressure sup-
ported by the is reached, the pressure reducing
valve blocks the entry of air into the beam, so the
excess air goes out through the top of the pressure
reducing valve.
Once the beam is inflated to the correct pressure,
remove the tube (B) end and refit the valve cap (A).
Inflate each beam to:
0.344 BARS / 5 PSI.
DO NOT INFLATE ABOVE
THESE VALUES AS THIS
MAY RESULT IN THE BEAMS
BURSTING.
TO DEFLATE
• Simply unscrew the deflation plug (refer to the picture
above) (C).
Notice TRIGANO DIABLO 6.indd 13
PRESSURE GAUGE
PRESSURE
REDUCING
VALVE
1
A
2
3
- 13 -
ENGLISH
«INFLATE»
B
C
C
21/09/2018 10:02