Waeco PerfectView M59L Instructions De Montage Et De Service page 45

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 58
_M59L_EB_10s.book Seite 45 Dienstag, 22. Januar 2008 4:59 16
PerfectView
Protect every through-hole made in the bodywork against water penetra-
tion, e. g. by using a cable with a sealant and by spraying the cable and
the the cable sleeve with sealant.
I
Note
Only start sealing through-holes when you have completed all
installation work on the camera and have laid the required cable
lengths.
7.2
Using branch connectors
To prevent loose connections in the branch connectors, it is important to
ensure that the cable cross sections fit into the branch connectors.
To use the branch connectors, proceed as follows:
➤ Insert the cable to be tapped in the front groove of the cable connector
(fig. b A, page 7).
➤ Insert the end of the new cable up to approx. 3/4 of the way into the rear
groove (fig. b B, page 7).
➤ Use a pair of combination pliers to close the connector by pressing the
metal pin in. This creates an electrical connection (fig. b C, page 7).
➤ Press down the safety cap until it snaps into place.
➤ Check that the connection is secure by lightly tugging the cable (fig. b D,
page 7).
7.3
Creating clean soldering joints
Proceed as follows to solder a cable to the original cables:
➤ Strip approx. 10 mm of insulation from the end of the original cable
(fig. c A, page 7).
➤ Strip approx. 15 mm of insulation from the end of the cable to be
connected (fig. c B, page 7).
➤ Wind the cable to be connected around the original cable and solder the
two cables together (fig. c C, page 7).
➤ Insulate the two cables with insulating tape (fig. c D, page 7).
General information on the electrical connections
45

Publicité

Table des Matières
loading

Table des Matières