INSTALLATION
Specification
16.2.4 Dual circuit operation
Dual meter measurement with power supply utility
contact, multiple phases
N
L1
L2
L3
K1
K2
3
L1
L2
L3
N
N
L1
L2
L3
K1
K2
3
L1
L2
L3
N
1 Power supply utility contact
2 Off-peak tariff
3 Peak tariff
www.stiebel-eltron.com
1/N/PE ~ 230 V
2/N/PE ~ 400 V
5 6
K2
K1
2
2/N/PE ~ 400 V
3/N/PE ~ 400 V
5 6
K2
K1
2
16.3 Heat up diagrams
The heat-up time depends on the cylinder capacity, cold water
inlet temperature and heating output.
Diagrams refer to 15 °C cold water inlet temperature:
Set temperature setting 65 °C
14
12
10
8
6
4
1
2
30
Set temperature setting 85 °C
14
12
10
8
6
4
2
30
1
X Nominal capacity in l
Y Duration in h
1 1 kW
2 2 kW
3 3 kW
4 4 kW
5 6 kW
16.4 Fault conditions
In the event of a fault, temperatures of up to 95 °C at 0.6 MPa
can occur.