Panasonic AW-PH400E Mode D'emploi page 19

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Installation
(Be sure to ask your dealer to install the unit.)
When installing onto a major structural component
(concrete with a thickness of 120 mm or more)
7 mm or more
[Anchor with an external thread] Fig. 1
<Positions and dimensions of mounting holes>
p Determine the length of the external threads or depth of the internal threads of the anchors after factoring
Note
in the thickness of the mounting areas of the pan-tilt head (47 mm in 3 locations, 5 mm in 1 location) and
thickness of the drop prevention underneath support plate (2 mm).
Drop prevention measures
For installing the underneath support plate:
• M8 nut
• Spring washer
• Flat washer
For installing the pan-tilt head:
• M6 nuts
• Spring washers
• Flat washers
At least 2 times the
bolt diameter
[Anchor with an internal thread] Fig. 2
AC inlet side of pan-tilt head
Check the positions and dimensions of the mounting holes above, and check
which is the AC inlet side. Then decide in which direction the pan-tilt head is to
be mounted, and fashion the anchors.
4-M6 holes (for mounting the pan-tilt head)
M8 hole (for mounting the
85 mm
underneath support plate)
18 (E)
Indoor Pan/Tilt Head AW-PH400
Drop prevention measures
For installing the underneath support plate:
• M8 bolt
• Spring washer
• Flat washer
For installing the pan-tilt head:
• M6 bolts
• Spring washers
• Flat washers

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Aw-rp400lAw-rc400lAw-rl400g

Table des Matières