Télécharger Imprimer la page

Publicité

Liens rapides

GUIDE D'INSTALLATION POUR ABRI DE
RÉSERVOIR GRANBY 2 EN 1
GRANBY 2 IN 1 RAIN COVER
INSTALLATION GUIDELINES
Page 1 / 6
SI0145_B
Revised: 2015-08-17
© 2015 GRANBY INDUSTRIES LIMITED PARTNERSHIP

Publicité

loading

Sommaire des Matières pour Granby 961225

  • Page 1 GUIDE D'INSTALLATION POUR ABRI DE RÉSERVOIR GRANBY 2 EN 1 GRANBY 2 IN 1 RAIN COVER INSTALLATION GUIDELINES Page 1 / 6 SI0145_B Revised: 2015-08-17 © 2015 GRANBY INDUSTRIES LIMITED PARTNERSHIP...
  • Page 2 ½" Long, 5x ½" Long, 5x Page 2 / 6 SI0145_B Revised: 2015-08-17 © 2015 GRANBY INDUSTRIES LIMITED PARTNERSHIP...
  • Page 3 • Place the rain cover on top of the tank and make sure the leak detector is at the back of the rain cover. 1" Long, 4x Page 3 / 6 SI0145_B Revised: 2015-08-17 © 2015 GRANBY INDUSTRIES LIMITED PARTNERSHIP...
  • Page 4 1" Long, 4x Page 4 / 6 SI0145_B Revised: 2015-08-17 © 2015 GRANBY INDUSTRIES LIMITED PARTNERSHIP...
  • Page 5 Page 5 / 6 SI0145_B Revised: 2015-08-17 © 2015 GRANBY INDUSTRIES LIMITED PARTNERSHIP...
  • Page 6 For passing the burner supply line through the cover, replace one of the plugs with a UL Listed outdoor rated bushing matching the pipe size to ensure a liquid-tight connection. Page 6 / 6 SI0145_B Revised: 2015-08-17 © 2015 GRANBY INDUSTRIES LIMITED PARTNERSHIP...

Ce manuel est également adapté pour:

961226