Getting Started - AEG STEAM STATION PERFECT DBS2300 Mode D'emploi

Table des Matières

Publicité

Getting started

1. Carefully remove all packaging
GB
materials. Position the steam
generator iron horizontally on the
ironing-board or on a heat resistant,
secure surface at the same height as
an ironing-board.
Unwind and straighten the power
cord and the steam cord.
4. Empty the water tank to rinse out
any foreign particles which may
remain from the manufacturing
process.
3
2. Remove the water tank by gripping
the slot on the underside and pulling
it gently away from the base unit.
5. Always refill the water tank to MAX
level using cold tap water.
1
2
3. Fill the water tank using cold tap
water.
6. Insert the water tank into the base
unit. Ensure that the water tank
latches securely into place.
D
GR
NL
F
GB
1
2
25/30

Publicité

Table des Matières
loading

Table des Matières