EdilKamin PELLET-BLOK Installation, Usage Et Maintenance page 29

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 40
INSTALLATION
Examples of channelling
50%
50%
50%
50%
50%
100%
50%
INSTALLING THE HOT AIR
CIRCULATION KIT
A complete kit containing everything required for channel-
ling the hot air is available.
Kit tre
- remove the two pre-drilled caps from the lid of the
PELLET-BLOK, pressing inward;
- secure the two fittings on the lid's holes;
- fit together the two pipes and secure them with the
dedicated clamps;
- attach the frames with fittings to the "B3" outlets
- connect the two aluminium pipes to the fittings of the
outlets, locking them in place with the clamps; snap the
grilles onto the fittings.
29

Publicité

Table des Matières
loading

Table des Matières