Gewiss
7. Device installation and connection
Before proceeding with device installation, remove the packaging, paying particular attention to not damage the casing.
Make sure there is no condensation inside the packaging. Otherwise, install the device only when it is completely dry.
All the installation operations must be carried out in compliance with the directive in force.
All operations that involve moving large weights must be done by two people.
The connection must only be made by qualified personnel, when the system is disconnected from the power supply.
Scrupulously check that the device is not energised when accessing it inside.
To measure the lack of voltage, use dielectric gloves and safety goggles that are type-approved for electrical risks.
All the installation operations must be carried out respecting the safety regulations and laws in force, and following the
instruction manual
7.1. General installation requirements
The device must be installed in a suitable environment that satisfies the information described in chapter "6. Preparation for
•
device installation"Preparation for device installation". Furthermore, the elements used in the rest of the installation must be
compatible with the device and compliant with the applicable law.
•
The ventilation and work space must be suitable for the maintenance operations according to the directive in force.
•
The external connection devices must be suitable and observe the distance established by the directive in force.
•
The section of the connection cables must be suitable for the maximum current intensity set on the charging unit.
•
Keep external elements away from the air intakes and outlets, as these could prevent correct device ventilation.
52
Device installation and connection
7.55.4.502.0 - Installation and Operation Manual