TP-Link EAP225 Guide D'installation page 14

Masquer les pouces Voir aussi pour EAP225:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 28
English
1
Attach the EAP/CAP to the mounting bracket
by aligning arrow (on the EAP/CAP) with arrow
(on the mounting bracket), then rotate the EAP/
CAP clockwise until it locks into place.
2
Make two small pencil marks on the wall. Make
sure the two marks are level and should be
98.6mm apart. Drill two 6mm holes through
the center of your marks.
3
Insert the plastic wall anchors into the 6mm
holes and drive the self-tapping screws into
the anchors. Do not drive the screws all the
way in and leave enough clearance to hang
the EAP/CAP.
4
Hang the EAP/CAP on the screws. Make sure
the EAP/CAP is firmly seated against the wall.
5
Connect the Ethernet cable to the ETHERNET
port on the EAP/CAP.
11
98.6mm

Publicité

Table des Matières
loading

Table des Matières