OPERATION
MACHINE INSTALLATION
UNCRATING MACHINE
1. Carefully check carton for signs of damage.
Report damages at once to carrier.
2. Check Carton Contents list, contact distributor for
missing items.
Carton Contents:
-
Machine, Model No. 614001
-
Battery Tray
-
3 Battery Cables
-
8 Battery Post Covers
-
8 Battery Cable Rubber Boots
Machine PAC 614002 includes:
-
Four- 6V, 240 AH Batteries (#222280)
-
24DC/120AC, 19A Battery Charger
(#1029256)
3. To uncrate the machine, remove the rear and front
shipping brackets that secure the machine to the
pallet. Position the supplied ramp at the rear of the
machine and carefully back the machine off the
pallet. Make sure the brush base is in the raised
position.
ATTENTION: Use the supplied ramp when
uncrating machine to prevent machine damage.
INSTALLING BATTERIES
WARNING: Keep Sparks And Open Flame
Away. Keep Battery Hood Open When Charging.
FOR SAFETY: When servicing machine, wear
protective gloves and safety glasses when
handling batteries and battery cables. Avoid
contact with battery acid.
Recommended Battery Specifications:
Four 6 volt, deep cycle, 240 AH batteries. Maximum
battery dimensions are 181 mm (7.13 in) W x 260 mm
(10.25 in) L x 292 mm (11.50 in) H.
1. Park the machine on a level surface and remove
the key from the machine.
8
2. Hinge open the recovery tank to access the
battery compartment (Figure 1).
3. Carefully install the batteries into the battery
compartment tray and arrange the battery posts
as shown (Figure 2).
4
BLACK
5
RED
ATTENTION: Do not drop batteries into
compartment, battery and machine housing
damage may result. This damage is not covered
by warranty.
4. Before connecting the battery cables, make sure
the terminals and posts are clean. Use a post
cleaner and wire brush if necessary.
NOTE: Apply a light coating of non-metallic grease or
protective spray on the cable connections to prevent
battery corrosion.
5. Connect the cables to the battery posts in
numerical order as labeled (Figure 2), RED TO
POSITIVE & BLACK TO NEGATIVE. Use the
battery post covers and rubber boots supplied.
6. After batteries are properly installed, check the
battery meter charge level. The machine must be
in full operation for an accurate reading (See
MACHINE OPERATION). Charge batteries if
needed.
FIG. 1
3
2
1
FIG. 2
Tennant 1510 (06- 14)