Klarstein MUNDSCHENK Mode D'emploi page 18

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

EN
18
Slide the component H through the center of the
component B and fasten it with component F.
Depending on the recipe and the quantity of output, it
makes sense to construct the sieves with either the short
(D) or long pipe (E).
4
Then, screw component
F onto the short or long
pipe. In this example, it
was screwed onto the long
pipe.
1
2
5
Now screw down the
upper perforated plate
including the pre-
assembled handles.
3
Next, attach the
handles (C) to the upper
perforated strainer (B).
6
The assembled screens are
now ready and can be
inserted into the pipe. The
combination should look
like this. The malt pipe
is now fully assembled
and can be placed in the
brewing kettle.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

10030521100316291004014410040145

Table des Matières