Télécharger Imprimer la page

This Must Be Considered During Installation; Tools; Abbreviations - Weka Holzbau 651.2929.06.00 Mode D'emploi

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 13
The damp-proofing material is not included in the scope of supply.

4.5. This must be considered during installation!

For the installation of you weka product, you must work in teams of minimum 2 people.
All screw connections must be pre-drilled to prevent
damage to the timber elements!
This symbol in the instruction document reminds you
to pre-drill:
To ensure perpendicularity, measure the diagonals and correct the position until the measured values are the
same.
Roof boarding
Where the roof is clad with tongued and grooved boards, do not push the boards together too tightly, as the
boards will swell slightly when exposed to moisture,
Note
Regularly check all screws and re-tighten them, if necessary. This product consists mainly of solid timber
elements. As timber is a natural product, it might shrink, so that screw connections become loose.

4.6 Tools

You should have the following tools to hand before beginning assembly:

4.7. Abbreviations

RW = Rear wall
WS = Wall thickness
We hope you have a successful installation and wish you many happy hours enjoying your weka
product.
© Copyright HRB 3662
Techn. Änderungen vorbehalten!
Alle Maßangaben sind ca. Maße.
12

Publicité

loading

Ce manuel est également adapté pour:

657.2626.00.01651.3838.06.00651.2929.05.00651.3838.05.00