First Commissioning - DIGEL HEAT CL-Serie Instructions D'utilisation Et De Montage

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4.3

First commissioning

Please note that the color that is still fresh and wet can cause the UV-color to
evaporate during the first heating phases (1-3 days). The color and its
evaporations are not hazardous to health and do not contain any solvents.
Safety data sheets can be requested from the respective dealer.
For commissioning of the infrared
1. Run the infrared heater for several hours (1-2 days, if necessary).
A pleasant room climate sets in immediately after this first commissioning.
2.
The operating time of the infrared heater can now be kept to a minimum or
be clocked with the room thermostat. We recommend using our high-
quality radio thermostat for the most efficient and energy-saving heating
of the Digel Heat infrared heater.
21

Publicité

Table des Matières
loading

Table des Matières