Machine Operation; Pre-Operation Checks - Tornado 2500B Glazer Manuel D'utilisation Et De Maintenance

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

PRE-OPERATION CHECKS

1. Sweep floor and remove debris.
2. Check condition of pad.
3. Check battery charge level (for accurate reading pad must be spinning).
4. Check that dust control filters are installed.
5. Make sure the floor is completely dry.
BURNISHING WITH 2500B
1. Turn on the main power switch.
2. If using 2500B with traction motor set dial for forward movement.
1.800.VACUUMS
a new spin on cleaning

Machine Operation

a Tacony Company
10

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

9849898499

Table des Matières