Mounting
Mounting preparation
Ensure the following before mounting:
Prerequisites
· The planning process is concluded.
· The Hi-O group function and necessary terminals are defined and the DIP switch
· The bridge is set correctly on the pins (jumper).
· The cables are identified and the wiring is completed.
· The necessary depth is available for flush installation of the switch box.
· It has been assured that protection category IP30 has been achieved after
Mounting
Fig. 3 :
Mounting example
positions are set correctly.
mounting.
39
EN