2- Pre-Installation Checks

Before installing the equipment, verify that all material on the following list is inside the
package:
One panel
Thirteen end of line resistors (4K7)
One end of line module for the extinction bottle.
5x20 2A fuse.
5x20 500 mA fuse
GB
Two keys keyboard access
Two keys operating mode selection
Instruction manual
Language labels
Battery cable
If you find any on the above material missing or damaged, contact your dealer.
The distributor will only be responsible for equipment that has not been used abnormally
(carefully read chapter 3.- Installation guide).

3- Installation Guide

This chapter defines the steps for proper installation of the extinguishing panel. The
installer must read the entire manual before installing the system. Not following the
instructions in this manual can cause damage to equipment.
Before installing this equipment must ensure that they meet the following conditions:
The ambient temperature should be between -10 º C and 40 º C.
The relative humidity should be below 95%.
Do not install the panel in places with mechanical vibrations or shocks.
Do not install the panel where it obstructs access to internal equipment and wiring
connections.
It is imperative that the fire detection and alarm system has been designed by qualified
personnel taking into account EN-54 part 14, as well as local regulations.
In the unlikely case that the unit is damaged on arrival, contact your distributor.
3.1- Pre-Installation Checks