Frymaster Super Runner Série Manuel D'installation, D'utilisation Et D'entretien page 7

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

CHAPTER 1: INSTALLATION INSTRUCTIONS
See gas valve illustration below and gas valve, burner and orifice location on page 1-5 when performing the following
conversions.
When converting from natural gas to propane (or vice-versa), the following procedures apply:
Burner orifices and pilot orifice MUST be replaced (see page 1-5 for required component part numbers).
Adjust orifice gas pressure by turning the gas-valve adjustment screw (see page 1-3 for gas types and
pressures).
After adjustment, replace the adjustment-screw cover.
Affix the new label included with the conversion kit next the existing rating plate stating that the gas type has
been converted. Remove any references to the previously used gas from the existing rating plate.
Conversion from one gas family to another (i.e. changing from natural gas to propane) requires special components.
Obtain the necessary components using the table on page 1-5.
Conversions can only be executed by qualified, factory-authorized personnel.
ON/PILOT/OFF
Knob
SUPER RUNNER SERIES GAS FRYERS
Pressure Flow
1-4
Adjustment
Vent Tube
Connection
Pilot Flow
Adjustment
Pressure Tap

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Super runner sr42Super runner sr52Super runner sr62

Table des Matières