Torin BIG RED T32001 Manuel Du Propriétaire page 9

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

SYSTEM AIR PURGE PROCEDURE
IMPORTANT: BEFORE FIRST USE
Before initial use and over time it is possible that air will enter the hydraulic system, causing poor lifting
performance. Perform the following Air Purge Procedure to remove any air that may have been introduced
into the hydraulic system as a result of product shipment and handling. This step is to be completed without
any weight on the crane.
1. Turn release valve counterclockwise on full turn to
the open position.
2. Rapidly pump the handle 6-8 times. Leave handle
in down position to expose oil fill plug.
3. With a flat blade screwdriver, push the oil fill
plug slightly to the side to purge trapped air from
system. (Use caution not to tear or puncture the
oil plug.)
4. Turn release valve clockwise to the closed
position.
5. Crane is now ready for use. Check for proper
pump action.
9
Oil Plug

Publicité

Table des Matières
loading

Table des Matières