Assembly Of The Air Ducts And External Grids; Preparing The Holes On The Machine; Positioning The Appliance - Olimpia splendid Unico twin Mode D'emploi Et D'entretien

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

2.3.1.3 -

ASSEMBLY OF THE AIR DUCTS AND EXTERNAL GRIDS

After drilling the holes (with the core drill), insert the plastic sheet (G) supplied with the air conditioner
(fig. 11) inside them.
Since the sheet (G) was made for 202 mm holes, you will have to cut off 130 mm from the long side of
the sheet for the 162 mm holes (fig. 11).
The sheets must be 65 mm shorter than the length of the wall.
Roll the sheet (G) and insert it into the hole, paying attention to the splicing line, which must always
face upwards. (fig.12).
Use an ordinary cutter for the foregoing operation (fig. 12).
to position the external grids, proceed as follows:
a. Apply the seal (F) to the wall flange (D), ensuring it lines up with the outer edge of the flange as indicated
in the figure 13.
b. Fix the two flanges using 2 pegs having a diameter of 6 mm and check that the two fixing holes are
horizontal (fig. 14 - 15 - 16).
c. Fit the small eyelet of the spring, with the long stem, on the cap pin (on both components) (fig. 17).
d. insert the two caps (with spring), on the front part of the external grid, on its two housings, pulling until
it clicks (fig. 18) and couple the two chains to the large eyelet of the spring.
e.
Using one hand, grip the two chains connected to the grid;
f. Bend the external grids back, gripping them with your free hand where they bend, and insert your fingers
inside the single fins (fig. 19).).
g. insert your arm into the pipe until the grid protrudes completely outwards.
h. Reopen the grid, being careful to keep your fingers inside the fins.
i.
Turn the grid until the fins are fully horizontal and tilted downwards.
l.
Pull the chain, tensioning the spring, and couple the chain ring to the pin of the inner flange through
which the pipes pass (fig. 20).
m. Use hand shears to cut off any excess chain links.
Use exclusively the supplied grids (E), or grids with like characteristics.
2.3.1.4 -

PREPARING THE HOLES ON THE MACHINE

the unit was built to be paired with 162-mm pipes and, in order to obtain best performance and noiseless-
ness, you should use the 202-mm holes. Configure the unit as follows:
Use a cutter to punch an opening on the rear cover and remove the covering part (fig. 21) so as to create
the air passage hole having a diameter of 202 mm.
2.3.1.5 -

POSITIONING THE APPLIANCE

To fix the bracket, drill the holes on the wall in the chosen position and fix it with the supplied dowels
(fig.22).
Correctly position the bracket by means of a level and tighten the plate using the corresponding screws
(fig.22).
Work as follows:
a. Raise the air conditioner holding it by the sides of the lower base and hook it to the plate (L1) (fig. 24).
Slightly tilt the lower part of the appliance towards yourself to ease the operation.
EN - 14

Publicité

Table des Matières
loading

Table des Matières