Energy meter and internet connection

The energy meter connection is required to get information of energy flow. The energy meter for
this product is not included with this product package. Before connecting the energy meter to
this product, install the energy meter. Refer to installation manual of the energy meter for more
information about energy meter installation.
Internet connection is required to use variety of functions such as network update, EnerVu
monitoring system, etc. You may need to contact your Internet service provider (ISP) to connect this
product to the internet.
2
WARNING
Make sure the AC circuit breaker, PV switch and DC circuit breaker of the battery are disconnected
before starting electrical cable connections.
Energy meter connection
1. Detach the energy meter plug from the product.
2. Strip two wires of the energy meter cable and insert stripped wire-ends to the corresponding
wire hole on the plug, match the numbers in the figure with the connectors on energy meter.
3. Connect the plug to the energy meter connector at the bottom of the product.
NOTE
y Compatible energy meter brand and model name are stated on page 78.
y The numbers described in the figure are the port number for the ABB energy meter connection.
Energy Meter
(Green)
Heatpump
(Not supported)
(Black)