Wiring Connections; Initialisation - Burkert 8624 Instructions De Service

Régulateur / compact de pression d'écoulement
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Wiring connections

not used
PE
Valve output
Fig. 2 Wiring connections
ATTENTION!
5

INITIALISATION

NOTE
è Connect the cable (Fig. 2).
è Put on the lid or the control unit .
è Insert the pressure controller onto the proportional valve (suitable valve
types: 6022, 6023, 6223, 2832, 2834).
è Screw the pressure controller tight.
ATTENTION!
Changing the direction of the cable outlet
è Carefully underlay the manifold with the screwdriver blade and lever it out
(Fig. 3).
è Turn the manifold into the desired position (max. 2x 90°).
è Press the manifold into the housing until it latches in.
ATTENTION!
28
PE
Do not connect any voltages to Terminal 5!
Terminal 5 is a 24V output for supplying the sensor
(e.g., 2-wire transmitter).
Work on the device should only be carried out by specialist staff
using the correct tools!
Switch off all voltages to the pressure controller before working
on it!
When screwing the pressure controller to the proportional
valve, ensure that the flat seal is properly seated!
Fig. 3: Turning the manifold
Do not twist off the cable ends!
GND
24 V DC
24 V DC output
GND
Pressure transmitter input 4 - 20 mA
GND
Standard signal input 4 - 20 mA
Type 8624

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

8624-b

Table des Matières