Installation • Instalación
Installation • Instalação
14
english
Please check the relevant legal regula-
tions in your country. You should also
contact the public authorities in your area,
since there may be regional variations.
1. Area of installation
• Sealed floor or spill basin!
QWIK-PURE 200 = 42 gallons
QWIK-PURE 350 = 62 gallons
It is crucial to ensure that untreated
condensate or oil cannot get into the
sewer system in the event of dam-
age.
• The floor area must be stable and level
(max. inclination 1°) to ensure reliable
functioning of the QWIK-PURE.
2. Inflow
Up to 4 feed points can be connected
directly to the QWIK-PURE.
If there are more than 4 feed points, it will
be necessary to lay a collecting line.
• Ring system along the wall:
- nominal diameter 1" (DN 25)
- above QWIK-PURE inlet (height above
floor)
- slight slope down to the QWIK-PURE
unit (min. 1°)
• Feed in the condensate from the top
into collecting line (swan-neck pipe
bend)
QWIK-PURE 200, 350