Installation
6.6
Routing supply lines to condenser unit
I
NOTE
• The installation manual for the SP950C condenser unit should also be
observed.
• Mount the SP950C condenser unit first to enable the exact position of the
condenser unit to be determined. This will save you bending the copper
pipe several times to make it fit.
• Make sure that the maximum length of the supply lines does not exceed
2.1 m.
• When mounting the SP950C condenser unit, care must be take to ensure
that the fastening holder included in the SP950I's scope of supply is also
bolted on for the strain relief. This is required for the 24 V connection
cable's strain relief.
Observe the following instructions when installing the supply lines:
• The maximum cable length between the evaporator and condenser unit is
2.10 m (fig. 4, page 4).
• Avoid any narrow radiuses when routing and bending supply lines. Use a
suitable round object with a shim as a bending aid. A radius which is too
narrow will kink the refrigerant line, and this will prevent the parking cooler
from operating.
➤ Shorten any supply line which is not needed by bending a curve.
Fasten the supply lines to the cab's rear panel using the clips provided (fig. 9,
page 6).
➤ Fasten clips (3) to cab's rear panel (1).
While doing so attach sealant (2), to prevent any water ingress between the
cab's rear panel and the clip.
I
NOTE
If you wish to avoid damaging the cab's rear panel, you can also fix the clip in
place using a suitable adhesive. Observe the instructions provided by the
adhesive manufacturer.
➤ Slide supply line into the clips.
➤ Insert cover (4).
22
CoolAir SP950I
EN