3. Installing the outdoor unit
A
■
KA24
<Pitch of the foundation bolt>
600 (23-5/8)
Min. 10 (13/32)
■
KA30, KA36
<Pitch of the foundation bolt>
600 (23-5/8)
en
5
mm (inch)
M10(3/8")bolt
A
Base
B
E
As long as possible.
C
Vent
D
C
Set deep in the ground.
E
D
Min. 360 (14-11/64)
600 (23-5/8)
175 (6-57/64)
175 (6-57/64)
950 (37-13/32)
D
Min. 475 (18-45/64)
600 (23-5/8)
Min. 25 (1)
225 (8-55/64) 225 (8-55/64)
1050 (41-11/32)
Fig. 3-1
• Be sure to install the unit in a sturdy, level surface to prevent rattling noises dur-
ing operation. (Fig. 3-1)
B
<Foundation specifications>
Foundation bolt
Thickness of concrete
Length of bolt
Weight-bearing capacity
• Make sure that the length of the foundation bolt is within 30 mm, 1-3/16 inch of
the bottom surface of the base.
• Secure the base of the unit firmly with four-M10 foundation bolts in sturdy locations.
Installing the outdoor unit
• Do not block the vent. If the vent is blocked, operation will be hindered and break-
down may result.
• In addition to the unit base, use the installation holes on the back of the unit to at-
tach wires, etc., if necessary to install the unit. Use self-tapping screws (ø5 × 15
mm, ø13/16 × 19/32 inch or less) and install on site.
Warning:
• The unit must be securely installed on a structure that can sustain its
weight. If the unit is mounted on an unstable structure, it may fall down and
cause damage or injuries.
• The unit must be installed according to the instructions in order to minimize
the risk of damage from earthquakes, typhoons, or strong winds. An incor-
rectly installed unit may fall down and cause damage or injuries.
mm (inch)
mm (inch)
M10 (3/8")
120 mm, 4-23/32 inch
70 mm, 2-3/4 inch
320 kg, 264 lbs