Digging Of Trenches - Trigano OSMOSE ANTHRACITE Notice De Montage Et Guide De Montage

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5 - Digging of Trenches

Depending on the dimensions of your pool, one, two or three trenches should be dug so that you can
position the horizontal rails in them. Also provide indentations for setting the end of the trenches and
for the pressure plates.
The trenches should be exactly the stated dimensions.
Check that the trenches are parallel with each other; start
by digging the central trench.
In order to ensure the right position of your trench,
assemble a complete set of 'horizontal rails'– vertical poles
- straps – press-plates'.
DIMENSIONS
6,10 X 3,60 X 1,20
7,30 X 3,60 X 1,20
7,65 X 4,60 X 1,20
9,20 X 4,60 X 1,20
All dimensions are stated in metres
S (m)
1,24
1,24
1,54
1,54
48 Notice N°880 107 Rev A

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

880107

Table des Matières