• Never connect other than the specified generator models (see page 4).
• Never connect a cable other than the receptacle box for parallel
operation.
• Connect and remove the receptacle box for parallel operation with
the engine stopped.
• For single operation, the receptacle box for parallel operation must
be removed.
1. Install the receptacle box for parallel operation on to the one
generator and secure it with setting band as shown.
• Set the belt on the front side of the handle.
• Secure the narrow belt to the handle with the hook and loop
fastener.
• Pass the upper wide belt through the lower belt hook and secure
with the hook and loop fastener.
• Route the receptacle box wires under the engine switch.
• Install the belts so they are not slack.
NARROW BELT
HOOK AND LOOP FASTENER
RECEPTACLE BOX FOR
PARALLEL OPERATION
(SOLD SEPARATELY)
HANDLE
WIDE BELT
HOOK AND LOOP FASTENER
LOWER BELT HOOK
ENGINE SWITCH
31