Mounting The Hood - Zephyr Breeze I Guide D'utilisation, D'entretien Et D'installation

Masquer les pouces Voir aussi pour Breeze I:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation Instructions

Mounting the Hood

Hood is designed for installation under a kitchen
cabinet (FIG. B)
1. Select preferred duct location (vertical or
horizontal) if ducting out of kitchen. Refer to
page 14 for details.
2. Begin installation by removing the filters (if
installed) and side spacer panels (36" models
only). (FIG. C)
3. Reinforce cabinet with 1"x2" wood strips if
additional strengthening is required or if
cabinets are framed.
4. Temporarily position the range hood in the
desired mounting location. Measure and
mark the mounting holes, duct and electrical
locations with a pencil.
5. Drill/cut out the required openings for duct and
electrical access by following the dimensions
on page 15; make sure the duct opening is
large enough to apply duct tape.
6. Fasten hood onto cabinet with (4) #6 wood
screws with washers provided.
7. Install electrical.
8. Install duct work and seal with duct tape.
9. Reinstall filters and side spacer panels (if
applicable).
10. Power up hood and check for leaks around
duct tape.
11. If recirculating the hood refer to page 18 and 19
for details.
20
Breeze I & Breeze II Use, Care, and Installation Guide
U N D E R - C A B I N E T
Electrical
FIG. B
Push in on panel latch and then pull panel down
FIG. C
C O R E
B R E E Z E I &
B R E E Z E I I
Duct
opening cutout
Duct/silver
tape
Add 1x2
wood strips

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Breeze ii

Table des Matières