Operation; Shutting Down - EarthQuake BADGER 20908 Manuel De L'utilisateur

Motoculteur à dents avant
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

WARNING
GASOLINE IS HIGHLY FLAMMABLE AND MUST BE
HANDLED WITH CARE. NEVER FILL THE TANK WHEN
THE ENGINE IS HOT OR RUNNING. ALWAYS MOVE
OUTDOORS TO FILL THE TANK.

OPERATION

Pre-Start Inspection
1. Make sure all safety guards are in place and all nuts and
bolts are secure.
NOTE: All hardware (nuts, bolts, etc) should be checked
for tightness before each use. Vibration of machine
can cause them to loosen.
2. Check oil level in engine crankcase. See your engine
manual for procedure and specifications.
3. Inspect air cleaner for cleanliness. See your engine manual
for procedure.
4. Check the fuel level. Fill the fuel tank no closer than one
inch from top of tank to provide space for expansion. See
your engine manual for fuel recommendations.
5. Be sure spark plug wire is attached and spark plug is
tightened securely.
6. Check position of wheels.
7. Check depth regulator drag stake position.
8. Examine underneath and around engine for signs of oil or
fuel leaks.
9. Inspect fuel hoses for tightness and fuel seepage.
10. Look for signs of engine damage.
11. Remove excessive debris from muffler area and recoil
starter.
12. Turn fuel shutoff valve to the ON position if engine is
equipped with one.
START-UP
The ON/OFF switch and choke lever required to cold start
the 20908 model rototiller are located on the engine and are
marked with ON/OFF and choke control symbols (See Opera-
tion Control Symbols in the Controls and Operating Symbols
section of this manual). SEE FIGURE 12A
The ON/OFF switch on the 24736 model rototiller is located on
the handle bar. SEE FIGURE 12B
A description of engine operation and all related precautions
and procedures can be found in the engine manufacturer's
manual that accompanies the tiller.
14
For additional information visit online at www.getearthquake.com or call 800-345-6007 M-F 8-5 CST
ON/OFF
Switch
Model 20908
ON/OFF
Switch
Model 24736
Cold Start
1. Push ON/OFF switch to the ON position.
2. Move choke lever to full choke position, if equipped.
3. Pull starting rope out slowly one time and allow to return
normally.
4. Pull starting rope out rapidly and allow rope to return normally.
5. When engine starts, gradually move choke lever to no
choke position, if equipped.
NOTE: The engine installed on the tiller is fixed speed
and does not have a throttle control.
Restarting A Warm Engine
Restarting an engine that is already warm from previous run-
ning does not normally require the use of the choke, if one is
equipped.
1. Push ON/OFF switch to the ON position.
2. Pull starting rope out rapidly until engine starts. Allow rope
to return normally. Repeat until engine starts.

Shutting Down

To stop the engine at any time, put the ON/OFF switch to the
OFF position. To stop tines at any time, release the drive safety
control to the neutral position.
Tilling
1. Adjust the depth regulator drag stake to achieve desired
tilling depth.
NOTE: Raise depth regulator lever up one hole at a
time, testing tiller operation after each adjustment.
Raising depth regulator lever too high can result in loss
of control of tiller!
2. Place the tiller in motion by pushing down on the drive
safety control lever; this will engage the tines.
Operator's Manual
BADGER Front Tine Tiller
FIGURE 12A
Choke
Lever
FIGURE 12B

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Badger 24736

Table des Matières