INSTALLATION REQUIREMENTS
TOOLS AND PARTS
Gather the required tools and parts before starting installation.
Read and follow the instructions provided with any tools listed
here.
Tools needed for all installations:
Flat-blade screwdriver
Level
Plastic putty knife
Tin snips (new vent
installations)
#2 Phillips screwdriver
Tape measure
4
Adjustable wrench that
opens to 1" (25 mm) or
hex-head socket wrench
Vent clamps
Caulking gun and compound
(for installing new exhaust vent)
1/4"( 6 mm) nut driver
(recommended)
Wire stripper (direct wire
installations)
Pliers
Tools needed for gas installations:
8" (203 mm) or 10"
(254 mm) pipe wrench
Pipe-joint compound
resistant to LP gas
Parts supplied (all models):
Leveling legs (4)
Parts supplied (steam models):
"Y" connector
Short inlet hose
Parts package is located in dryer drum. Check that all parts
are included.
Parts needed (steam models):
5' (1.52 m) inlet hose
If using a power supply cord:
Use a UL listed power supply cord kit marked for use with
clothes dryers. The kit should contain:
A UL listed 30-amp power supply cord, rated 120/240 volt
■
minimum. The cord should be type SRD or SRDT and be
at least 4 ft. (1.22 m) long. The wires that connect to
the dryer must end in ring terminals or spade terminals
with upturned ends.
A UL listed strain relief.
■
8" (203 mm) or 10"
(254 mm) adjustable wrench
(for gas connections)
Rubber washer