6 m series
GB
Instructions
Select a flat surface for the tent. Unpack the boxes and check if all listed parts are included.
with a cloth. Remove the slight oil film from the pipes with a cloth. In colder weather
conditions we suggest to bring the roof to room temperature before installing.
1
Assemble the roof frame by mounting parts 10 to 15 on the pipes (parts 1, 2, and 3).
Use the screws 22 and 23 to attach the parts.
2
Attach the reinforcement braces (parts 4 and 5) using screws (24) and wing nuts (27).
3
Lift one side of the tent frame and attach the legs (7 and 8). Place the roof (34) onto the frame.
4
Attach the legs on the other side and install the feet (16, 16a and 17) at the bottom. Make sure, that the leg
pipes are in vertical position, to avoid overtention on the endwalls. Attach the side covers to the pipes (7)
using hooks (33).Reinforce the side frame by attaching the diagonal pipes (6) to all four corners. Complete
the bottom frame with the required pipes (2) and connector (18). Use the big ground pegs (19) to fasten the
feet to the ground.
5
Extend the end walls (36) and attach the end walls directly to the roof using the bungees (31). Use the short
ground pegs (21) to fasten the end walls to the ground.
professional
27