Installing Your Freezer; Unpacking Your Freezer; Adjusting Your Freezer; Proper Air Circulation - Haier HF50CW20W Guide De L'utilisateur

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

English

Installing Your Freezer

Unpacking Your Freezer

1. Remove all packaging material. This includes the foam base and all
adhesive tape holding the freezer accessories inside and
outside.
2. Inspect and remove any remains of packing, tape or printed
materials before powering on the freezer.
CAUTION
Risk of Fire or Explosion due to puncture of refrigerant tubing.
Flammable refrigerant used. Handle with care when moving freezer to
avoid either damaging the refrigerant tubing or increasing the risk of a
leak.

Adjusting Your Freezer

• Your freezer is designed for freestanding installation only.
It should not be recessed or built-in.
• Place the freezer on a floor strong enough to support it fully loaded.
• When moving the freezer, never tilt it more than a 45-degree angle.
This could damage the compressor and the sealed system.
• If the freezer is tilted let it stand in an upright position for at least 24
hours prior to plugging. This is to allow the refrigerant to settle.

Proper Air Circulation

• To assure your freezer works at the maximum efficiency it
was designed for, you should install it in a location where there
is proper air circulation, plumbing and electrical connections.
• The following are recommended clearances around the freezer:
Sides...............4" (102mm)
Back..................4" (102mm)
Top....................Do not block
5

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Hf71cw20w

Table des Matières