EN
1. PleaSe ReaD theSe INStRUctIoNS caReFUlly aND comPletely BeFoRe aSSemBlING yoUR GReeNhoUSe.
2. Sharp edges and corners can cause injury. Always wear protective glasses, gloves, shoes and headgear when handling the aluminium profiles, glass and
polycarbonate sheets. Broken glass is a safety hazard – always clear up immediately and dispose of with care.
3. The product you have purchased is intended only for growing plants and should only be used for this purpose. When used for other purposes we will take
no responsibility.
4. It is recommended that this greenhouse is assembled by two people.
5. Should you encounter difficulties constructing this house, or in fitting the glass or polycarbonate sheets, please contact your retailer
– do not use force!
6. The greenhouse must always be anchored.
SIte SelectIoN
Always try to select a sunny location, sheltered
from the wind as much as possible.
ImPoRtaNt
Before assembling your new greenhouse,
please check that all parts in the provided list
are included. Please take each bundle out of
the packaging in order to identify the parts
better.
It is important that the opened bundles do not
get mixed with one another.
If something is missing please contact your
retailer.
Nuts (1002) - max. tightening torque 3Nm.
NeceSSaRy toolS
Screw drivers (Normal and Crosshead PH2),
10 mm socket spanner or wrench, 10 mm
combination spanner, knife, measuring stick,
spirit level, Accu-drill with adjustable torque.
maINteNaNce
The greenhouse should be thoroughly washed
with a gentle detergent occasionally. Please
check that the detergent used does not react
aggressively with aluminium or the glass fixing
clips.
Ensure that the upper and lower door tracks
are cleaned regularly to avoid a build-up of
debris.
0. BaSe
Important! The base must be exactly square
and level. A zinc-coated steel base is available
as an accessory for all greenhouse models.
(attention! Only when the greenhouse has to
be located in a very windy and unprotected
location: Drill through both the profile at the
base of the greenhouse and the steel base,
and connect them with nuts and bolts.)
If you would rather construct your own stone
or concrete foundation, please follow the
4
Safety Warning
Assembly Instructions
dimensions specified in diagram 0. Treated
wooden beams at least 18 mm high and not
more than 32 mm wide should be positioned
between the stone/concrete foundation and
the aluminium frame, and connected to the
foundation with 50 mm long bolts (not pro-
vided).
Foundations must extend down below the frost
level.
Diagrams in a single frame show the view
from inside the greenhouse. those enclo-
sed in a double frame show the view from
outside the greenhouse.
1. SIDe elemeNtS
Lay all of the parts on the floor and connect
them loosely.
At this stage it is necessary with each vertical
aluminium bar (3032) to include an extra
connecting bolt, to later connect corner braces
(2056) (1.5). On the outside bars (3032) in-
clude one additional extra bolt, to also connect
cross braces (3095) (1.2).
Loosely connect the corner plate (1092) (1.1).
In step 4 the corner plate bolts must also be
connected to the gable ends.
2. PlaIN GaBle eND
Lay all of the parts on the floor and connect
them loosely.
Include two extra connecting bolts in the
vertical bars (3041 and 3042) to connect the
cross braces (2.2) and (2.6). In the vertical bar
(3101) please include only one extra bolt.
3. DooR GaBle eND
Lay all of the parts on the floor and connect
them loosely.
The door runner bars (1347) will be connected
to the horizontal bar (2048). Connect these
loosely from the outside with three nuts and
bolts.
Connect (5001) and (5002) as shown in (3.10)
(3.11) with a nut and bolt.
As in step 2, please include two extra bolts in
both vertical bars (3041) and (3042) (3.3).
4a. coNNectING the SePaRate
elemeNtS
Bolt the side elements to the end elements
(4.1) & (4.2).
Loosely connect the corner plate (1092) above
the eaves (4.3).
Assemble the ridge bar and then the corner
plates (1092) on the gable ends (4.4/4.5).
Connect the door runner supports (2043) to
the door runner bars (1347) using washer
(6060) (4.1) and to the gable end using bolt
(4201) and spacer (1310) (4.3) (4.6).
4B. coNNectING the SePaRate
elemeNtS
Connect the roof glazing bars (2055) between
the eaves (4.7) and the ridge bar (4.8). Insert
extra bolts into each glazing bar depending on
which house you have bought. The number is
indicated in a circle on each bar and to be
read beginning from both ends.
The corner braces (2056) (4.7), the roof
braces (3057) (4.9) and the cross braces
(2033) (4.11) (4.12) (4.13) can now be con-
nected.
Now position your greenhouse on the pre-
pared base/foundation and connect loosely.
Adjust the greenhouse until it is completely
square and tighten all bolts.
Please do not over tighten. (max. 3Nm)
Press the end protectors (1017) and (1018)
onto the profile ends (4.10).
5R. and 5l. DooR
attention: Do not stand the assembled
door on the door gliders (1014) to avoid
012.01.1807