Télécharger Imprimer la page

Appendix A: Installation Protocol - Nederman RBU 1300 Manuel De L'utilisateur

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 105
EN
11 Appendix A: Installation protocol
• Copy the installation protocol, fill it in and save it as a service record.
• For values, note the value in the resuJClt column, otherwise, a tick will suffice if the item has been performed
or considered.
If a value is outside the limit or a result is incorrect or missing, this must be rectified before the initial
start-up and normal operation.
Unit number
 
Description
Delivery checks
Missing components
Transport damage
Before installation
Foundation
Total weight
Access for maintenance
Mounting (check availability)
Optional: Maintenance switch
Installation room and ventila-
tion openings (indoor install-
ation)
Foundation and outdoor
placement (outdoor installa-
tion)
Dust collector
Duct system
Optional: Pilot signal cable
Start- and control unit
Exhaust air duct directed
away from the unit
Compressed air
Air lines cleaned
22
RBU
Date
Reference
Section 5.1 Delivery check
Section 5.1 Delivery check
Section 5.2.2 Foundation
Section 3.1 Technical data
Section 5.2.1 Location
Section 4.1 Connections
Section 6.1 Indoor installation
Section 5.2.2 Foundation,
Section 6.2 Outdoor installa-
tion
See dust collector manual
Section 4.1 Connections
Section 4.1 Connections
See the start- and control
unit manual
Chapter 6 Installation
Section 6.3 Compressed air
installation
Performed by
Result
Notes

Publicité

loading

Ce manuel est également adapté pour:

Rbu 1600Rbu 1600eRbu 2100Rbu 2100eRbu 2600Rbu 2600 fc