6.
Operating instructions
1.
TITAN steel strap around package
from top. Pull end of strap until it is
positioned in the middle of the
package below the upper strap.
2.
Pull through the strap end until it is in
the centre of the package beneath
the upper run of strap and juts out
approx. 15 cm.
3.
With the left hand hold the upper and
lower run of the strap together. Both
straps must be placed exactly on top
of one another. Grip and press rocker
509 together with the cutting lever 35
with the right hand. Insert the steel
strap laterally until it strikes against
the case wall, ensuring that the lower
run of strap projects slightly out of the
tool at the front. The right hand now
releases the levers which have been
pressed together.
HKE-L
If the straps are not inserted correctly in the tool, it is not possible to
perform the tensioning operation.
H 223 EU 21/06
22 / 47