Installation; Required Tools; Required Materials - Erreka NAOS Manuel De L'installateur

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 69

INSTALLATION

1

REQUIRED TOOLS

Flathead screwdriver 0.6 x 3.5
8 mm and 14 mm open-end wrenches
Ring wrench 17mm
8 mm and 14 mm socket wrench
Marker pencil
Spirit level
Tape measure
2

REQUIRED MATERIALS

Bolts to attach the strips to the ceiling, the front support
to the wall and the door anchor to the door
Saw for cutting metal
Electrical drill and broaches
Use the electrical drill in line with the user
guide.
Ladder
Use a robust ladder of sufficient height.
Respect the instructions on use.
Track lubrication grease (graphite or lithium grease)
NAOS garage door opener operator
English
41

Publicité

Table des Matières
loading

Table des Matières