Pre-Assembly; Planning Assembly; Tools Required - Muskoka 37-196-48 Guide D'utilisation Et D'entretien

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Pre-Assembly

PLANNING ASSEMBLY

Before you begin assembly, locate the instructions and hardware. Compare all parts with the Hardware
Included and Package Contents lists. Be sure you have all the parts and can identify them. A helping hand is
always good. Assemble your mantel with an adult assistant if possible. Some pieces are heavy and will need to
be held by a helper. Assembly time will take approximately 30-60 minutes.
Before assembly, use scissors to unwrap the parts from the packaging. Do not use a box cutter or exacto-knife,
as you may cut into the mantel pieces inside the box and damage the finish. Check for the red hardware bag
located inside the packaging. Do not discard any pieces. Use an appropriate screwdriver to insert and tighten
all screws.

TOOLS REQUIRED

Safety
goggles
HARWARE INCLUDED
Note: Hardware not shown to actual size.
AA
BB
HH
JJ
Part
Description
AA
Bolt
BB
Short Connector
CC
Long Connector
DD
Dowel
EE
Knob
FF
Back Panel Screw
GG
Door Hinge Plate
(NOT INCLUDED)
Phillips
screwdriver
CC
KK
LL
Quantity
33
2
2
36
2
30
4
DD
EE
MM
Part
Description
HH
Shelf Pin
JJ
Hinge Screw
KK
Long Screw
LL
Long Metal Bolt
MM
Short Metal Bolt
NN
Metal Cam Lock
FF
GG
NN
Quantity
8
16
2
4
4
8
3

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

37-196-204

Table des Matières