Gas Feeding Line; Probe-Electrode Positioning - Riello BS2/M TL Manuel D'entretien

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

ATTENTION
The tube connecting valve tap P F with boiler tap A must be positioned so that any condensate is drained into
the combustion chamber and not inside the valve.
The run for the pulse lines must be short.
It is necessary for the pulse lines not to touch the boiler since the high temperature would damage them.
In certain applications, where pressure measurement in the combustion chamber is inaccurate, it is neces-
sary to move the G1/8 connector from the burner flange to the boiler door. In this case, blank the flange hole.
Failure to do so may cause the valve to malfunction, and to be damaged.
3.3

GAS FEEDING LINE

1
Fig. 7
Gas supply pipe
1 –
Manual cock
2 –
(charged to the installer)
Gas pressure gauge
3 –
(charged to the installer)
4 –
Filter
Gas pressure switch
5 –
Electromagnetic safety valve
6 –
Electromagnetic operating valve
7 –
Pressure governor
8 –
Pressure
in
P
F
chamber
3.4
PROBE - ELECTRODE POSITIONING
ATTENTION
Verify that the plate (3, fig. 8) is always inserted in the
flattening of the electrode (1).
Lean the probe insulator (4) against the cup (2).
TYPE
A
30
916M
917M
31
918M
31
3134
2
M1
4
Air pressure at combustion head
P
L
Gas-supply pressure test point
M1 –
Pressure point for gas measurement at
M2 –
gas train outlet
Pressure point for gas pressure meas-
M3 –
urement at combustion head
combustion
5
6
7
3.5
±
0.3
3
D6088
7
GB
M2
M3
P
F
P
L
Fig. 8
A
±
0.3
1
4
D4430
2