Commissioning/Start-Up - Oase biOrb EARTH Notice D'emploi

Masquer les pouces Voir aussi pour biOrb EARTH:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 17
Filling the unit
Access the unit and fill the biOrb EARTH as desired.
A variety of decorative items and plants are available from OASE retail partners or at
www.oase.com.
NOTE
Ensure that the items used to fill the unit do not cover ventilation grilles, rain nozzles and sen-
sors.
To ensure that the rain is true to nature, the rain nozzles must be aligned so that the entire
space gets rained on, if at all possible.
How to proceed:
 A

Commissioning/start-up

Filling the liquid reservoir
The liquid reservoir must be filled sufficiently to permit the mist and rain function. The mist and
rain function is deactivated automatically if the liquid level is too low.
The LED flashes blue if there
is insufficient liquid.
NOTE
We recommend only using "biOrb HumidiMist" to fill the liquid reservoir. It contains the required
electrolytes for the organisms in the unit and prevents limescale deposits on the glass, rain noz-
zles and mist generator.
How to proceed:
 B
14
After filling the liquid reser-
voir, press the button to
acknowledge the message.
The "OASE Control" app also
signals a lack of liquid and it
is possible to acknowledge
this message in the app.
BOB0334

Publicité

Table des Matières
loading

Table des Matières