3. Introduction
Positioning of blast chiller
Before unloading/loading and positioning the blast
chiller inside the shop/kitchen, you are kindly re-
quested to read carefully the instruction manual
in the different chapters regarding the unloading/
Transport
Do not superimpose blast chiller packing (allowed
only if there is wooden crate packing option). We
recommend you to transport the blast chiller al-
ways in the upright position (as mention on the
packing). If the blast chiller with built in condensing
unit was inclined during transportation we suggest
you to keep the product in the suggested upright po-
sition for at least 8 hours, before switching it on. In
this way, you will allow the oil to flow in all the com-
ponents, lubricating them again. Afterwards you
can proceed with the start.
Unloading/ Dimensions/ Weight
The unloading/loading procedures should be exe-
cuted by pallet-jack or by forklift driven by skilled
and authorized staff. We decline any liability for fail-
ing to comply with safety rules currently in force.
Before starting the unloading, positioning and in-
stallation procedures of the blast chiller freezer
Packing
At the delivery please check that the packing is in-
tact and that during transportation no damage was
occurred. Remove the external carton-box; remove
the fastener that keeps still the blast chiller/freezer
to its pallet, put it in the correct position and then
remove the adhesive white protection of the stain-
Condensate water draining / draining connection
The blast chiller is available with a built in condens-
ing unit complete with a removable condensate wa-
ter basin with manual defrost (without defrost heat-
Positioning and feet regulation
Place the blast chiller in a perfect horizontal posi-
tion, acting if necessary on the screw type adjusta-
ble feet. Use a spirit level to check it. The blast chill-
er must be placed in order to operate properly and
allow the correct defrost condensate water drain-
loading, dimensions, weight, evaporating water ba-
sin, adjustable feet, electric connections and main-
tenance procedures of the blast chiller subjected in
the present manual.
inside the shop/kitchen according to the model of
the blast chiller, please read carefully the informa-
tion showed in the dimensions and weights list.
The manufacturer declines any responsibilities due
to operations performed without adopting the above
safety precautions.
less steel. The recovery and the recycling of the
packing materials such us, plastic, iron, carton box,
wood help the saving of row material and reduce the
waste. Please consult your area address book for
disposal of materials and authorized garbage
dump.
er). The basin is assembled in the lower part, under
the condensing unit.
ing. In this way you will avoid
noisy vibrations of the condens-
ing unit. Check the correct posi-
tioning of the condensate water
basin and its draining.
EN
5