Connection of safety transmitter-receiver photocells in closing (SG.C)
Connection of safety transmitter-receiver photocells in opening (SG.A)
Connection to the mains
We recommend installing opening and closing
safety photocells.
1 Complete the connections as shown in the figure.
2 Duly programme the operator:
Closing photocells with pre-testing: C511
Closing photocells without pre-testing: C510
Without closing photocells: C500
For further details on programming, see "Start up
and programming" on page 54.
We recommend installing opening and closing
safety photocells.
1 Complete the connections as shown in the figure.
2 Duly programme the operator:
Opening photocells with pre-testing: C411
Opening photocells without pre-testing: C410
Without opening photocells: C400
For further details on programming, see "Start up
and programming" on page 54.
1 Connect the line cable (L) to the connection strip
lower cable connector and the neutral cable (N) to
the upper cable connector.
2 Connect the earth cable (T) to the operator frame.
3 Ensure the main fuse (F) is correctly in place.
Fuse (DNS424E): FUS 5x20, 2.5A
Fuse (DNS424EM): FUS 5x20, 4A
Never forget to connect the earth cable, in
order to prevent the risk of electrical discharge.
P275H
INSTALLATION
DINGO operator for sliding gates
53