Erreka DINGO Manuel De L'installateur page 55

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Secure the operator
AB
Check the installation
AB
Fit the cover
AB
1 Position the operator unlocked and without the
exterior cover.
2 Adjust the operator at the precise rack distance, in
accordance with the arrows.
3 Position the fastening screws (A) with their
corresponding washers and tighten.
4 Tighten the anti-turn screws (B) but without forcing
them.
5 Complete the electrical connection as shown in
"Electrical connections" on page 52.
P275C
1 Lock the operator.
2 After completing the electrical connections, check
that the rack is correctly in place by running the
operator: select parameter C101 and use the
pushbuttons
3 If anomalies are observed, put them right before
proceeding with programming.
P275D
1 After completing installation and programming,
position the cover in order to protect the operator
from the weather.
P275E
INSTALLATION
v
and
to open and close the gate.
^
DINGO operator for sliding gates
51

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Dns424eDns424em

Table des Matières