6.3.1.2.2 Hose Connection With Plug Section And Clamping Section - Ecolab EcoPro Manuel D'utilisation

Masquer les pouces Voir aussi pour EcoPro:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6.3.1.2.2 Hose connection with plug section and clamping section

1
2
3
4
5
6
Fig. 11: Pipe/hose connection with tapered part
1
Hose
2
Swivel nut
3
Clamp
4
Cone
1.
Cut hose (Pos. 1) straight.
2.
Push the swivel nut (pos. 2) over the hose (pos. 1).
3.
Push the clamping piece (pos. 3) over the hose (pos. 1).
4.
Push the hose (pos. 1) onto the tapered part (pos. 4) up to the stop collar (detail A1).
5.
Push the clamping piece (pos. 3) in the direction of the tapered part (pos. 4) until
resistance is noticeable.
6.
Place an O-ring (pos. 5) in the groove of the suction or pressure valve (pos. 6).
7.
Tighten the union nut (2) (detail B1).
A1
B1
41
Mounting and installation
5
O-Ring
6
Suction valve, pressure valve
A1 Pipe or Hose plugged on
B1 Valve connection: Target state after assembly
417102264 Rev. 6-12.2019

Publicité

Table des Matières
loading

Table des Matières