After setting up the electrical connection to the lift,
the hydraulic system can be filled.
Variant push button
• Unscrew the oil filling opening.
• Fill hydraulic oil (HLP 32). 9 litres of HLP 32 are re-
quired
• Raise the lift approx. 1 m by pushing the lift button.
The lift rails can be lifted at different times!
• Plug in the lifting arm bolts and provide with safety
rings.
• Push the lift button and raise the lift to its upper-
most end position.
• Push and hold the lift button for another 60 sec-
onds so air can escape from the system and the
overflow procedure equalises the lifting rails to
each other.
For first commissioning, it is normal to have a dif-
!
ferent start up and a large "shaking" in the up-
permost position. Air trapped in the system must
be completely removed first.
• Afterwards lower the lift to its lowest position. Push
and hold the button until the lifting arms are com-
pletely lowered.
The oil level (in the lowest lift po-
!
sition) should be within the min./
max display in the oil tank.
• After commissioning, the sticker (first filling) can be
removed.
First filling without sticker
Required oil volume (HLP 32) for system, hoses and
cylinders. 13 litres HLP 32
• After setting up the electrical connection to the
lift, the hydraulic system can be filled.
• Loosen and remove the unit cover.
• Unscrew the oil filling opening.
• Fill hydraulic oil (HLP 32). 9 litres HLP 32
• Raise the lift approx. 1 m by pushing the lift button.
The lift rails can be lifted at different times!
• Hang in the lifting arms and provide with safety
rings.
• Push the lift button and raise the lift to its upper-
most end position.
• Fill the tank with hydraulic oil HLP 32. About 4 litres
are still needed
• Push and hold the lift button for another 60 sec-
onds so air can escape from the system and the
overflow procedure equalises the lifting rails to
each other.
OPI-POWER LIFT HF 4600-V3.0-DE-EN-FR-ES-IT
For first commissioning, it is normal to have a dif-
!
ferent start up and a large "shaking" in the up-
permost position. Air trapped in the system must
be completely removed first.
• Afterwards lower the lift to its lowest position. Push
and hold the lift button until the lifting arms are
completely lowered.
The oil level (in the lowest lift position) should be
!
within the min./max. display in the oil tank (see
photo above).
Variant Operating lever
9
9 Operating lever
10 2 x Allen key operating lever
11 Oil filling opening
• Loosen and remove the plastic part of the oper-
ating lever (9) of both Allen screws (10).
• Loosen and remove the unit cover.
• Unscrew the oil filling opening (11).
• Fill hydraulic oil (HLP 32). 9 litres of HLP 32 are re-
quired.
• Raise the lift approx. 1 m by pushing the operat-
ing lever (9). The lift rails can be lifted at different
times!
• Plug in the lifting arm bolts and provide with safety
rings.
• Push the operating lever forwards and raise the lift
to its uppermost end position.
• Push and hold the operating lever for another 60
seconds so air can escape from the system and
the overflow procedure equalises the lift to each
other.
For first commissioning, it is normal to have a differ-
!
ent start up and a large "shaking" in the uppermost
position. Air trapped in the system must be com-
pletely removed first.
• Afterwards lower the lift to its lowest position. Pull
10
11
99