Maintenance Plan - Nussbaum POWER LIFT HF 4600 Manuel D'exploitation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

7.1
Maintenance plan
i
Before beginning service, disconnect from power. The work area around the lift is to be secured against
unauthorised use.
Visual
Spray
inspection
Time frame
Position
Type of
maintenance
12
1
11
2
10
365 x / 12
9
3
4
8
5
7
6
12
1
11
2
10
365 x / 12
9
3
4
8
7
5
6
12
1
11
2
10
365 x / 12
9
3
4
8
5
7
6
12
1
11
2
10
1 x / 12
9
3
4
8
5
7
6
OPI-POWER LIFT HF 4600-V3.0-DE-EN-FR-ES-IT
Oil
Lubricate
The lift cylinder can sweat and small oil droplets can form on the base
plate, this is however, not a leak.
Model and information signs, labels, brief operating instructions,
safety stickers and warning information are to be cleaned and ex-
changed if damaged.
Check the foot bumper for condition and function. Exchange if dam-
aged.
The rubber acceptance plate is to be checked for wear and replaced
if necessary.
Check the tracks and the lift rail equalization parts for wear. After
cleaning, grease with multi-purpose grease. We exclusively recom-
mend that MO-2 high performance lubricating grease is used. (avail-
able for purchase directly from Oest).
Check the lifting arm block and gear for wear. Exchange if there is
visible damage.
Clean with
Clean
compressed
air
Maintenance plan
Inspect
93

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Hlk246.2000010d-5001

Table des Matières