Installation; Boiler Fixing - Riello FS15D Manuel D'entretien

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

TEST BOILER
The working field has been defined according to EN 676 standard.
COMMERCIAL BOILERS
The burner-boiler matching is assured if the boiler conforms to EN 303 and the combustion chamber dimen-
sions are similar to those shown in the diagram EN 676. For applications where the boiler does not conform to
EN 303, or where the combustion chamber is much smaller than the dimensions given in EN 676, please con-
sult the manufacturers.
CORRELATION BETWEEN GAS PRESSURE AND BURNER OUTPUT
To obtain the maximum output, a gas head pressure of 4.6 mbar is measured ( M2 , see chapter 3.3, page 4) with
the combustion chamber at 0 mbar using gas G20 with a net heat value of 10 kWh/Nm
5.0
4.5
4.0
3.5
3.0
2.5
2.0
50
D6345
50,000
3.

INSTALLATION

THE BURNER MUST BE INSTALLED IN CONFORMITY WITH LEGISLATION AND LOCAL STANDARDS.
3.1 BOILER FIXING
IMPORTANT
Boiler door must have a max. thickness of 100 mm,
refractory lining included.
If thickness is greater (max. 260 mm), a combustion
head extension must be fitted, which is supplied
separately.
HINGE
ASSEMBLY
2748
60
80
100
75,000
S7393
120
140
100,000
125,000
Thermal power
Separate the combustion-head assembly
from the burner body by removing nut (1) and
removing group (A).
Fix the head assembly group (B) to the boiler
(2) insert the supplied insulating gasket (3).
A
3
GB
3
(8,570 kcal/Nm
160
180
kW
150,000
kcal/h
1
3
D4160
B
3
).
2

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

3759003

Table des Matières