Steinbach Active Balls 50 Notice Originale page 45

Masquer les pouces Voir aussi pour Active Balls 50:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 61
4. Position the riser pipe including
screen
in the middle of the filter
8
vessel bottom.
Make sure that the protrusion in the
middle of the filter vessel bottom fits
into the recess of the screen.
5. Fill the filter vessel
filter balls.
Please refer to the section "Technical
data" for the required quantities.
6. Insert the vessel seal
foreign objects in the groove and make
sure that the seal is fitted correctly.
7. Align the notch on the outer edge of
the filter cover
lug of the filter vessel.
8. Place the filter cover on the filter
vessel.
Make sure that the riser pipe
inserted into the recess at the bottom
of the filter cover.
9. Place the locking ring
filter cover and filter vessel connecting point.
10. Insert the locking ring bolt
11. Pass the locking ring bolt through the hole on the opposite side of the clamping ring.
12. Place the wing nut
13. Remove the bleeder screw
with Steinbach
6
. Check for any
3
with the adjustment
1
is
7
around the
2
into the hexagon socket of the locking ring.
4
onto the thread and turn it clockwise to tighten it.
5
on the filter cover by turning it counterclockwise.
28
3
4
5
2
4
1
7
8
3
5
45

Publicité

Table des Matières

Dépannage

loading

Ce manuel est également adapté pour:

Active balls 75

Table des Matières