Cable Management; Adjustment - CHIEF iCSPDA2 Instructions D'installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 41
Installation Instructions
4
1
E x2
2
5
1
A
R x4
2

CABLE MANAGEMENT

CAUTION:
Ensure that adequate cable slack
exists for movement of display, and that cables will
not be pinched by installation of covers (E) or screws
(R).
1.
Carefully insert cables into cavities located in lower
portions of arm assembly (A).
2.
Install each cover (E) with two screws (R).

ADJUSTMENT

WARNING:
Excessive loosening or tightening of
adjustment mechanism can result in serious
personal injury or damage to equipment!
1.
To adjust pitch/swivel/roll, slightly loosen
adjustment knob (counterclockwise when looking
at back of display), move display to desired angle,
and retighten adjustment knob.
2.
To adjust extension, slightly loosen or tighten
adjustment screws using hex key (S). Adjust
screws ONLY as required to achieve desired
tension.
iCSPDA2
15

Publicité

Table des Matières
loading

Table des Matières