Yamaha WaveRunner GP1300R Manuel De Montage page 16

Table des Matières

Publicité

HANDLEBAR AND THROTTLE CABLE INSTALLATION
EXPLODED DIAGRAM
INSTALLATION CHART
Step
Procedure/Part name
HANDLEBAR AND THROTTLE
CABLE INSTALLATION
1
Lower handlebar holder
2
Handlebar assembly
3
Upper handlebar holder
Bolt 8 × 55 mm (0.31 × 2.17 in)
4
Q'ty
Follow "Step" order for installation.
2
1
NOTE:
2
• Align the punched marks a on the handlebar
with the top surface of the lower handlebar
holders.
• The upper handlebar holder should be
installed with the punched mark b forward.
NOTE:
4
Tighten the bolts so that the front clearance c
of the upper handlebar holder is smaller than
the rear clearance d.
– 4 –
Service points
E

Publicité

Table des Matières
loading

Table des Matières