Erreka MAGIC MAS210F Manuel De L'installateur page 56

Masquer les pouces Voir aussi pour MAGIC MAS210F:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

INSTALLATION
Connect the motor to the control panel (AEP20PIL)
Before making any electrical connections,
check
the
manual.
Before carrying out any gate movement,
ensure there is no person or object in the
radius of action of the gate and the
operation mechanisms.
1 Connect the motor (M1, M2) and the capacitor
(C1, C2) to the control panel.
Connect the motor's earth cable to the
earth terminal (T) on the control panel.
C1, C2: capacitors
E1: encoder A1
1
Red:
2
Copper shield: (-)
3
Blue:
E2: encoder A2
4
Red:
5
Copper shield: (-)
6
Blue:
52
Installation manual
control
panel
instructions
G2: motor A2
7
Brown:
8
Black:
(+)
9
Grey:
signal
F2: brake A2
10 Orange
11 Violet
(+)
T
Yellow-green: earth
signal
2 Connect the control panel to the power supply.
3 Activate the power supply switch.
4 Using the control panel mini push buttons
(PUL1, PUL2, PUL3, PUL4), check the motor
connections are correct (rotation direction).
If the rotation direction is not correct,
interchange the wires 12 and 13 of M1 or 7 and
8 of M2, as appropriate.
Ensure the earth cable of the motors is
connected to the control panel earth
terminal.
G1: motor A1
turn 1
12 Brown:
turn 2
13 Black:
common
14 Grey:
F1: brake A1
15 Orange
16 Violet
T
Yellow-green: earth
turn 1
turn 2
common

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Magic mas250f

Table des Matières